Print Inspection Report

Date Time
12/21/2024
6:53 AM
St. Mary's County Inspection Requests  
Permit Details
Permit No. SFDD22-1364 Permit Type   SINGLE FAMILY DWELLING DETACHED Site Address   48635 WHITAKER RD
SAINT INIGOES, MD 20684
Applied   06/13/2022 Applicant  
Approved   01/02/2024 Owner   BORENZWEIG SUZANNE R
Issued   12/28/2022 Contractor   MARK CULLISON
Parent Permit No.   Description   DEMO OLD HOUSE REPLACE WITH NEW HOUSE DETACHED GARAGE
  Notes  
 
Date of Inspection Inspection Type Inspector Result Remarks Notes

Heading 07/05/2023BLDG FOOTINGJFinchAPPROVED

Heading 07/05/2023BLDG FRAMINGJFinchAPPROVED

Heading 07/05/2023ELEC ROUGHJFinchAPPROVED

Heading 07/05/2023ELEC SERVICEJFinchAPPROVEDSMECO temp cut in card 29315

Heading 07/05/2023HVAC ROUGHJFinchAPPROVED

Heading 07/05/2023PLBG ROUGHJFinchAPPROVED

Heading 07/10/2023BLDG INSULATIONJFinchAPPROVED

Heading 11/29/2023ZONE SWM ROUGH-INRSandidgePARTIALLY APPROVED11/28/2023 1:56:17 PM 22-136448635 WHITAKER ROAD SAINT INIGOES MD 20684 JUSTIN BROWN 240-298-4992 STORMWATER MANAGEMENT ROUGH IN 11/28/2023 SHELIA SMITH OFFICE MANAGER 11/29/2023 10:39:30 AM I made site visit and the PVC pipes are in place for gutter drains and the pit is dug and fabric is installed. Looks good. Pictures attached.

Heading 12/06/2023PLBG GAS TEST ROUGHJFinchAPPROVED

Heading 12/29/2023BLDG FINALJFinchDISAPPROVED

Heading 12/29/2023PLBG FINALJFinchAPPROVED

Heading 12/29/2023PLBG GAS FINALJFinchAPPROVED

Heading 12/29/2023HVAC FINALJFinchAPPROVED

Heading 01/22/2024ZONE OVERLOT GRADINGLOwensAPPROVED1/22/2024 2:20:00 PM 6” of fall in 10’ from the foundation has been met and is correct per site plan. Pictures have been taken.

Heading 01/22/2024ZONE STORM WATER MANAGEMENTLOwensAPPRVD WTH EXCEPTN1/22/2024 2:21:27 PM Storm water devices are properly located and sized. All downspouts are in correct locations and splash blocks are in place. Pictures taken. Will bond plantings in Storm Water Pond

Heading 01/22/2024ZONE 911 ADDRESSLOwensAPPROVED1/22/2024 2:28:27 PM 911 Posted as required. Pictures taken.

Heading 01/22/2024ZONE CRITICAL AREALOwensAPPRVD WTH EXCEPTN1/22/2024 2:29:09 PM will bond CAPA

Heading 01/22/2024BLDG FINALJFinchDISAPPROVED

Heading 01/22/2024ELEC FINALJFinchAPPROVED

Heading 01/26/2024BLDG FINALJFinchDISAPPROVED

Heading 02/28/2024BLDG FINALJFinchAPPROVEDALL TRADES FINALED

Heading 10/01/2024ZONE SWM FINALLOwensAPPROVED10/1/2024 1:42:52 PM Storm water devices are properly located and sized. All downspouts are in correct locations and splash blocks are in place. Pictures taken.

Heading 10/01/2024ZONE CAPA INSPECTIONLOwensAPPROVED10/1/2024 1:43:40 PM All required plants are planted per CAPA Agreement.

HeadingZONE CAPA SURVIVAL 2YRInspection Coordinator